A Distribution System Expansion Planning method Considering Integrated Energy Service Providers’ Revenue on Energy Storage Investment

Loading...
Thumbnail Image

Paper number

1993

Working Group Number

Conference name

CIRED 2019

Conference date

3-6 June 2019

Conference location

Madrid, Spain

Peer-reviewed

Yes

Short title

Convener

Authors

Liu, Yuquan, China Southern Power Grid Corp. Limited, China
Zhao, Xinyi, Tsinghua-Berkeley Shenzhen Institute Tsinghua University, China
Shen, Xinwei, Tsinghua-Berkeley Shenzhen Institute Tsinghua University, China
Xiong, Wen, China Southern Power Grid Corp. Limited, China
Wang, Li, China Southern Power Grid Corp. Limited, China
Zeng, Shunqi, China Southern Power Grid Corp. Limited, China
Yu, Zhiwen, China Southern Power Grid Corp. Limited, China
Li, Xin, Guangzhou Power Supply Co. Ltd., China

Abstract

In this paper, a planning method for distribution system expansion is proposed, considering distribution feeders upgrading, as well as sizing and siting Energy Storage System (ESS), the investment of which is shared by Integrated Energy Service Provider (IESP) and Distribution System Operator (DSO). The revenue which comes from the ESS arbitrage will attract IESP to invest on ESS, thus achieving a balance between distribution system upgrading and ESS investment. The model is solved by Benders decomposition to obtain the optimal planning results. Case studies based on IEEE 33 nodes and real-world demonstration project prove the effectiveness of the proposed method.

Table of content

Keywords

Publisher

AIM

Date

2019-06-03

Permanent link to this record

https://cired-repository.org/handle/20.500.12455/679
http://dx.doi.org/10.34890/28

ISSN

2032-9644

ISBN

978-2-9602415-0-1