CIM-based systems integration project at Elektro Celje DSO

dc.contributor.affiliationElektroinstitut Milan Vidmar - EIMV
dc.contributor.affiliationElektroinstitut Milan Vidmar - EIMV
dc.contributor.affiliationGDI d.o.o.
dc.contributor.affiliationGDI d.o.o.
dc.contributor.affiliationBintegra d.o.o.
dc.contributor.affiliationBintegra d.o.o.
dc.contributor.affiliationIskratel d.d.
dc.contributor.affiliationElektro Celje d.d.
dc.contributor.authorSouvent, Andrej
dc.contributor.authorKodek, Timotej
dc.contributor.authorKavčič, Mateja
dc.contributor.authorPetrovič, Viki
dc.contributor.authorRauter, Dušan
dc.contributor.authorRisteski, Nikola
dc.contributor.authorBenassi, Rene
dc.contributor.authorLubej, Peter
dc.contributor.countrySlovenia
dc.contributor.countrySlovenia
dc.contributor.countrySlovenia
dc.contributor.countrySlovenia
dc.contributor.countrySlovenia
dc.contributor.countrySlovenia
dc.contributor.countrySlovenia
dc.contributor.countrySlovenia
dc.contributor.detailedauthorSouvent, Andrej, Elektroinstitut Milan Vidmar - EIMV, Slovenia
dc.contributor.detailedauthorKodek, Timotej , Elektroinstitut Milan Vidmar - EIMV, Slovenia
dc.contributor.detailedauthorKavčič, Mateja, GDI d.o.o., Slovenia
dc.contributor.detailedauthorPetrovič, Viki, GDI d.o.o., Slovenia
dc.contributor.detailedauthorRauter, Dušan, Bintegra d.o.o., Slovenia
dc.contributor.detailedauthorRisteski, Nikola , Bintegra d.o.o., Slovenia
dc.contributor.detailedauthorBenassi, Rene , Iskratel d.d., Slovenia
dc.contributor.detailedauthorLubej, Peter, Elektro Celje d.d., Slovenia
dc.date.accessioned2019-07-24T12:45:40Z
dc.date.available2019-07-24T12:45:40Z
dc.date.conferencedate3-6 June 2019
dc.date.issued2019-06-03
dc.description.abstractThis paper gives an insight into the CIM based integration pilot project at the DSO Elektro Celje. This project was done as part of the bilateral cooperation project between the Slovenian TSO – ELES covering a consortium of partners and the Japanese agency NEDO with its’ authorized contractor Hitachi, Ltd. The main goal of the project was to utilize IT integration standards based on the IEC CIM (Common Information Model – family of standards IEC61970, IEC61968 and IEC62325). The main aim was to integrate DSO’s existing OT/IT systems (Geographic Information System – GIS and Metering Data Management System – MDMS) and newly introduced Distribution Management System (DMS). Within the project we have implemented multiple use cases in order to demonstrate the effectiveness of such an approach. In this paper we state what the goals were, as well as some implementation details about the project and eventually discuss the lessons that were learned during the project.
dc.description.conferencelocationMadrid, Spain
dc.description.conferencenameCIRED 2019
dc.description.openaccessYes
dc.description.peerreviewedYes
dc.description.sessionDSO business environment enabling digitalization and energy transition
dc.description.sessionidSession 6
dc.identifier.isbn978-2-9602415-0-1
dc.identifier.issn2032-9644
dc.identifier.urihttps://cired-repository.org/handle/20.500.12455/627
dc.identifier.urihttp://dx.doi.org/10.34890/854
dc.language.isoen
dc.publisherAIM
dc.relation.ispartProc. of the 25th International Conference on Electricity Distribution (CIRED 2019)
dc.relation.ispartofseriesCIRED Conference Proceedings
dc.titleCIM-based systems integration project at Elektro Celje DSO
dc.title.number1883
dc.typeConference Proceedings
Files
Original bundle
Now showing 1 - 1 of 1
Loading...
Thumbnail Image
Name:
CIRED 2019 - 1883.pdf
Size:
407.84 KB
Format:
Adobe Portable Document Format