LISCOOL – A Demonstration Project of an Automated Fast Demand Response Management System: Main Outcomes
Loading...
Paper number
1526
Working Group Number
Conference name
CIRED 2019
Conference date
3-6 June 2019
Conference location
Madrid, Spain
Peer-reviewed
Yes
Short title
Convener
Authors
Marques, Luis , EFACEC, Portugal
Campos, Filipe , Efacec, Portugal
Fonseca, RUI , DAIKIN, Japan
NAKAGAWA, KOICHI , DAIKIN, Japan
MASUDA, RYOH , DAIKIN, Japan
Campos, Filipe , Efacec, Portugal
Fonseca, RUI , DAIKIN, Japan
NAKAGAWA, KOICHI , DAIKIN, Japan
MASUDA, RYOH , DAIKIN, Japan
Abstract
The increasing integration of Renewable EnergyResources (RES) in distribution systems with an inherentvariable production along with the inclusion of new assets,such as Electric Vehicle Charging Stations, is leading toan increasingly challenging network management. Theseassets, besides having a volatile demand profile, may alsorequire large amounts of energy from the grid in shortperiods, which a traditional electrical grid is not preparedto respond to. To address this growing issue, anAutomated Demand Response System (ADRS) wasdeveloped under LISbon COOL (LISCOOL) energyproject scope. This paper aims at presenting the project’smain results and lessons learnt from the first year ofoperation, while briefly introducing the system’sarchitecture. The results show the adequacy of the systemto reduce the variability of the demand and to promotebetter standards of energy efficiency. In addition, thesystem is effective on helping grid operator tacklingcontingency situations in the network.
Table of content
Keywords
Publisher
AIM
Date
2019-06-03
Published in
Permanent link to this record
https://cired-repository.org/handle/20.500.12455/436
http://dx.doi.org/10.34890/664
http://dx.doi.org/10.34890/664
ISSN
2032-9644
ISBN
978-2-9602415-0-1