Democrat: Demonstrator of a micro-grid integrating storage
Loading...
Paper number
0390
Working Group Number
Conference name
CIRED 2018 Ljubljana Workshop
Conference date
7 - 8 June 2018
Conference location
Ljubljana, Slovenia
Peer-reviewed
Yes
Short title
Convener
Authors
Ribeiro, Marta, Efacec , Portugal
Marques, Luís, Efacec , Portugal
Miranda, Ismael, Efacec , Portugal
Bernardo, Alberto, Efacec , Portugal
Marques, Luís, Efacec , Portugal
Miranda, Ismael, Efacec , Portugal
Bernardo, Alberto, Efacec , Portugal
Abstract
The increasing integration of renewable energy sources in electrical systems along with the inclusion of recent technologies such as Electric Vehicles (EVs) that require large amounts of energy from the grid in a short period of time lead to additional variability on consumption patterns and the network management becomes more challenging. A micro-grid (MG) integrating Battery Energy Storage Systems (BESS) can contribute to mitigate these challenges, allowing a more flexible, efficient and reliable network operation. Therefore, and in order to meet the identified challenges, Efacec presents an innovative MG demonstration project: DEMOCRAT, with the integration of solutions and technologies in the field of Smart Grids (SG) and storage.
Table of content
Keywords
Publisher
AIM
Date
2018-06-07
Permanent link to this record
https://www.cired-repository.org/handle/20.500.12455/1102
http://dx.doi.org/10.34890/111
http://dx.doi.org/10.34890/111
ISSN
2032-9628
ISBN
978-2-9602415-1-8