Standardization and contingency storage for submarine cable systems

dc.contributor.affiliationSINTEF Energy Research
dc.contributor.affiliationREN Sjøkabelberedskap AS
dc.contributor.affiliationREN Sjøkabelberedskap AS
dc.contributor.authorHalvorson, Hans Lavoll
dc.contributor.authorJohansson, Magnus
dc.contributor.authorHaukanes, Bjørn
dc.contributor.countryNorway
dc.contributor.countryNorway
dc.contributor.countryNorway
dc.contributor.detailedauthorHalvorson, Hans Lavoll, SINTEF Energy Research, Norway
dc.contributor.detailedauthorJohansson, Magnus, REN Sjøkabelberedskap AS, Norway
dc.contributor.detailedauthorHaukanes, Bjørn, REN Sjøkabelberedskap AS, Norway
dc.date.accessioned2019-07-24T12:38:06Z
dc.date.available2019-07-24T12:38:06Z
dc.date.conferencedate3-6 June 2019
dc.date.issued2019-06-03
dc.description.abstractIn Norway the population of submarine cables in the distribution network (1-170 kV) is extremely diversified. Numerous unique designs, voltage levels and cross sections exists. This contributes to making contingency planning and repairs time-consuming and expensive. The cable systems are commonly characterized by their importance for reliable power delivery in the system and that special competence is needed to build, operate and repair them. New solutions have been found through national collaboration and an effort to standardize. Thirty network owners have entered a co-ownership to establish a contingency storage for standardized submarine cables, joints and terminations thus aiming to reduce costs and repair time in the future. The total investment of approximately 250 MNOK now covers approximately 1200 submarine cable systems. An individual investment for each partner would add up to more than 1 500 MNOK to achieve the same level of contingency preparedness.
dc.description.conferencelocationMadrid, Spain
dc.description.conferencenameCIRED 2019
dc.description.openaccessYes
dc.description.peerreviewedYes
dc.description.sessionNetwork components
dc.description.sessionidSession 1
dc.identifier.isbn978-2-9602415-0-1
dc.identifier.issn2032-9644
dc.identifier.urihttps://cired-repository.org/handle/20.500.12455/210
dc.identifier.urihttp://dx.doi.org/10.34890/409
dc.language.isoen
dc.publisherAIM
dc.relation.ispartProc. of the 25th International Conference on Electricity Distribution (CIRED 2019)
dc.relation.ispartofseriesCIRED Conference Proceedings
dc.titleStandardization and contingency storage for submarine cable systems
dc.title.number943
dc.typeConference Proceedings
Files
Original bundle
Now showing 1 - 1 of 1
Loading...
Thumbnail Image
Name:
CIRED 2019 - 943.pdf
Size:
174.7 KB
Format:
Adobe Portable Document Format