Sizing of a battery system based on simulation of operation in an islanded network

Loading...
Thumbnail Image

Paper number

0331

Working Group Number

Conference name

CIRED 2018 Ljubljana Workshop

Conference date

7 - 8 June 2018

Conference location

Ljubljana, Slovenia

Peer-reviewed

Yes

Short title

Convener

Authors

Nesterov, Dimitri, Tractebel, Belgium
Leemput, Niels, Tractebel, Belgium
Doms, Jozef, Tractebel, Belgium

Abstract

The paper proposes a model and a methodology to size a battery system, which is aimed to operate in conjunction with a utility-scale PV plant for grid impact mitigation. The methodology covers the design choices that need to be made in the planning phase, when the detailed data and technical characteristics are not available. The model is based upon the requirements imposed by the transmission system operator and makes use of solar irradiance and grid frequency data. The studied time frame is an entire year, and it can be extended depending on the available data.

Table of content

Keywords

Publisher

AIM

Date

2018-06-07

Permanent link to this record

https://www.cired-repository.org/handle/20.500.12455/1079
http://dx.doi.org/10.34890/63

ISSN

2032-9628

ISBN

978-2-9602415-1-8