BESS located in Primary Substation for RES integration and ancillary services provision

dc.contributor.affiliationPolitecnico di Milano
dc.contributor.affiliationPolitecnico di Milano
dc.contributor.affiliationPolitecnico di Milano
dc.contributor.affiliationPolitecnico di Milano
dc.contributor.affiliationPolitecnico di Milano
dc.contributor.authorDelfanti, Maurizio
dc.contributor.authorBovera, Filippo
dc.contributor.authorFalabretti, Davide
dc.contributor.authorMerlo, Marco
dc.contributor.authorRancilio, Giuliano
dc.contributor.countryItaly
dc.contributor.countryItaly
dc.contributor.countryItaly
dc.contributor.countryItaly
dc.contributor.countryItaly
dc.contributor.detailedauthorDelfanti, Maurizio, Politecnico di Milano, Italy
dc.contributor.detailedauthorBovera, Filippo, Politecnico di Milano, Italy
dc.contributor.detailedauthorFalabretti, Davide, Politecnico di Milano, Italy
dc.contributor.detailedauthorMerlo, Marco, Politecnico di Milano, Italy
dc.contributor.detailedauthorRancilio, Giuliano, Politecnico di Milano, Italy
dc.date.accessioned2019-07-24T12:50:46Z
dc.date.available2019-07-24T12:50:46Z
dc.date.conferencedate3-6 June 2019
dc.date.issued2019-06-03
dc.description.abstractIn this paper a model for simulating provision of multipleservices via Battery Energy Storage System (BESS) ispresented. The results of several sets of simulations areproposed. Applications analysed are renewable energysource support and provision of frequency regulation viaBESS. The approach proposed is designed with respect tomany directions: the system operator perspective(accuracy and reliability of the service provision are themain goals); the economic viability perspective(highlighting capex, cash flows, return on investment); thetechnology perspective (i.e. evaluating the impact thatdifferent setpoints could have on the BESS state of health),via qualitative and quantitative analysis of the level ofexploitation of the system. The final goal is to evaluate thefeasibility in the provision of multiple servicessimultaneously.
dc.description.conferencelocationMadrid, Spain
dc.description.conferencenameCIRED 2019
dc.description.openaccessYes
dc.description.peerreviewedYes
dc.description.sessionDistributed energy resources and efficient utilisation of electricity
dc.description.sessionidSession 4
dc.identifier.isbn978-2-9602415-0-1
dc.identifier.issn2032-9644
dc.identifier.urihttps://cired-repository.org/handle/20.500.12455/796
dc.identifier.urihttp://dx.doi.org/10.34890/1019
dc.language.isoen
dc.publisherAIM
dc.relation.ispartProc. of the 25th International Conference on Electricity Distribution (CIRED 2019)
dc.relation.ispartofseriesCIRED Conference Proceedings
dc.titleBESS located in Primary Substation for RES integration and ancillary services provision
dc.title.number2320
dc.typeConference Proceedings
Files
Original bundle
Now showing 1 - 1 of 1
Loading...
Thumbnail Image
Name:
CIRED 2019 - 2320.pdf
Size:
480.52 KB
Format:
Adobe Portable Document Format