BESS located in Primary Substation for RES integration and ancillary services provision
Loading...
Paper number
2320
Working Group Number
Conference name
CIRED 2019
Conference date
3-6 June 2019
Conference location
Madrid, Spain
Peer-reviewed
Yes
Short title
Convener
Authors
Delfanti, Maurizio, Politecnico di Milano, Italy
Bovera, Filippo, Politecnico di Milano, Italy
Falabretti, Davide, Politecnico di Milano, Italy
Merlo, Marco, Politecnico di Milano, Italy
Rancilio, Giuliano, Politecnico di Milano, Italy
Bovera, Filippo, Politecnico di Milano, Italy
Falabretti, Davide, Politecnico di Milano, Italy
Merlo, Marco, Politecnico di Milano, Italy
Rancilio, Giuliano, Politecnico di Milano, Italy
Abstract
In this paper a model for simulating provision of multipleservices via Battery Energy Storage System (BESS) ispresented. The results of several sets of simulations areproposed. Applications analysed are renewable energysource support and provision of frequency regulation viaBESS. The approach proposed is designed with respect tomany directions: the system operator perspective(accuracy and reliability of the service provision are themain goals); the economic viability perspective(highlighting capex, cash flows, return on investment); thetechnology perspective (i.e. evaluating the impact thatdifferent setpoints could have on the BESS state of health),via qualitative and quantitative analysis of the level ofexploitation of the system. The final goal is to evaluate thefeasibility in the provision of multiple servicessimultaneously.
Table of content
Keywords
Publisher
AIM
Date
2019-06-03
Published in
Permanent link to this record
https://cired-repository.org/handle/20.500.12455/796
http://dx.doi.org/10.34890/1019
http://dx.doi.org/10.34890/1019
ISSN
2032-9644
ISBN
978-2-9602415-0-1