BESS located in Primary Substation for RES integration and ancillary services provision

Loading...
Thumbnail Image

Paper number

2320

Working Group Number

Conference name

CIRED 2019

Conference date

3-6 June 2019

Conference location

Madrid, Spain

Peer-reviewed

Yes

Short title

Convener

Authors

Delfanti, Maurizio, Politecnico di Milano, Italy
Bovera, Filippo, Politecnico di Milano, Italy
Falabretti, Davide, Politecnico di Milano, Italy
Merlo, Marco, Politecnico di Milano, Italy
Rancilio, Giuliano, Politecnico di Milano, Italy

Abstract

In this paper a model for simulating provision of multipleservices via Battery Energy Storage System (BESS) ispresented. The results of several sets of simulations areproposed. Applications analysed are renewable energysource support and provision of frequency regulation viaBESS. The approach proposed is designed with respect tomany directions: the system operator perspective(accuracy and reliability of the service provision are themain goals); the economic viability perspective(highlighting capex, cash flows, return on investment); thetechnology perspective (i.e. evaluating the impact thatdifferent setpoints could have on the BESS state of health),via qualitative and quantitative analysis of the level ofexploitation of the system. The final goal is to evaluate thefeasibility in the provision of multiple servicessimultaneously.

Table of content

Keywords

Publisher

AIM

Date

2019-06-03

Permanent link to this record

https://cired-repository.org/handle/20.500.12455/796
http://dx.doi.org/10.34890/1019

ISSN

2032-9644

ISBN

978-2-9602415-0-1