A New Installation Technology of Mid-Voltage Cable Joint Using RTV Silicone Rubber Adhesive
Loading...
Paper number
709
Working Group Number
Conference name
CIRED 2019
Conference date
3-6 June 2019
Conference location
Madrid, Spain
Peer-reviewed
Yes
Short title
Convener
Authors
Zhu, Xiaohui, State Grid Tianjin Electric Power Research Institute, China
Meng, Zhengzheng, State Grid Tianjin Electric Power Research Institute, China
Zou, Huai, State Grid Tianjin Electric Power Research Institute, China
Meng, Zhengzheng, State Grid Tianjin Electric Power Research Institute, China
Zou, Huai, State Grid Tianjin Electric Power Research Institute, China
Abstract
The installation quality becomes the main reason causing the insulation failure of mid-voltage cable accessories. In this paper, based on the problem analysis during the installation process, a new installation technology of mid-voltage cable accessories by using RTV silicone rubber adhesive was put forward to eliminate the insulation defects in the conventional installation process. By constructing the insulation testing system, the withstand voltage test, partial discharge check, water-resistant test, surface flashover test and bonding pressure test were conducted to verify the feasibility and safety of the proposed installation method. The test results showed that the proposed method can enhance the operation reliability of mid-voltage cable joints and reduce the technical difficulty of on-site installation.
Table of content
Keywords
Publisher
AIM
Date
2019-06-03
Published in
Permanent link to this record
https://cired-repository.org/handle/20.500.12455/125
http://dx.doi.org/10.34890/255
http://dx.doi.org/10.34890/255
ISSN
2032-9644
ISBN
978-2-9602415-0-1