Managing uncertainty in load related investment decisions
Loading...
Paper number
2046
Working Group Number
Conference name
CIRED 2019
Conference date
3-6 June 2019
Conference location
Madrid, Spain
Peer-reviewed
Yes
Short title
Convener
Authors
Black, Mary, Northern Powergrid, United Kingdom
Spencer, Andrew, Northern Powergrid, United Kingdom
Nicholson, Mark, Northern Powergrid, United Kingdom
Spencer, Andrew, Northern Powergrid, United Kingdom
Nicholson, Mark, Northern Powergrid, United Kingdom
Abstract
Electricity Distribution Network Operators (DNO’s) in the UK face uncertainty about future peak loading on the network at a time when electrification of heat and transport is expected to increase the demand for electricity and continued increase in distributed generation (DG) presents other challenges for managing the network. This paper discusses a new decision support tool for load related investment planning, in a time of future load forecast uncertainty, at Northern Powergrid (NPg) – a DNO in the North of England.
Table of content
Keywords
Publisher
AIM
Date
2019-06-03
Published in
Permanent link to this record
https://cired-repository.org/handle/20.500.12455/705
http://dx.doi.org/10.34890/928
http://dx.doi.org/10.34890/928
ISSN
2032-9644
ISBN
978-2-9602415-0-1