A Planning Method of On-load Capacity Regulating Distribution Transformers in Urban Distribution Networks after Electric Energy Replacement
Loading...
Paper number
60
Working Group Number
Conference name
CIRED 2019
Conference date
3-6 June 2019
Conference location
Madrid, Spain
Peer-reviewed
Yes
Short title
Convener
Authors
GAN, Lin, China Southern Power Grid, China
MO, Wenxiong, China Southern Power Grid, China
FANG, Jian, China Southern Power Grid, China
RAO, Yi, China Southern Power Grid, China
TAN, Yu, China Southern Power Grid, China
ZHANG, Hang, China Southern Power Grid, China
MO, Wenxiong, China Southern Power Grid, China
FANG, Jian, China Southern Power Grid, China
RAO, Yi, China Southern Power Grid, China
TAN, Yu, China Southern Power Grid, China
ZHANG, Hang, China Southern Power Grid, China
Abstract
Replacing conventional distribution transformers with on-load capacity regulating distribution transformers reasonably can effectively cope with the high peak-valley difference of load after electric energy replacement and reduce the no-load loss of distribution transformers. Thus, in order to reduce the loss of distribution transformers in urban distribution network after electric energy replacement, this paper proposed a planning method of on-load capacity regulating distribution transformers. Then, the distribution transformer planning of electric energy replacement points in an urban distribution network was carried out by this method. The examples showed that the planning method has a strong feasibility and of great guiding significance to distribution transformer planning in urban distribution network after electric energy replacement and promotion of on-load capacity regulating distribution transformers.
Table of content
Keywords
Publisher
AIM
Date
2019-06-03
Published in
Permanent link to this record
https://cired-repository.org/handle/20.500.12455/138
http://dx.doi.org/10.34890/272
http://dx.doi.org/10.34890/272
ISSN
2032-9644
ISBN
978-2-9602415-0-1