Loss of Neutral in Low Voltage Electrical Installation with connected DG units – Consequences and Solutions

dc.contributor.affiliationDemocritus University of Thrace
dc.contributor.affiliationDemocritus University of Thrace
dc.contributor.affiliationDemocritus University of Thrace
dc.contributor.affiliationDemocritus University of Thrace
dc.contributor.affiliationNational Technical University of Athens
dc.contributor.authorFrantzeskakis, Syllas
dc.contributor.authorVoglitsis, Dionisis
dc.contributor.authorPapanikolaou, Nick
dc.contributor.authorChristodoulou, Christos
dc.contributor.authorGonos, Ioannis
dc.contributor.countryGreece
dc.contributor.countryGreece
dc.contributor.countryGreece
dc.contributor.countryGreece
dc.contributor.countryGreece
dc.contributor.detailedauthorFrantzeskakis, Syllas, Democritus University of Thrace, Greece
dc.contributor.detailedauthorVoglitsis, Dionisis, Democritus University of Thrace, Greece
dc.contributor.detailedauthorPapanikolaou, Nick, Democritus University of Thrace, Greece
dc.contributor.detailedauthorChristodoulou, Christos, Democritus University of Thrace, Greece
dc.contributor.detailedauthorGonos, Ioannis, National Technical University of Athens, Greece
dc.date.accessioned2019-07-24T12:37:42Z
dc.date.available2019-07-24T12:37:42Z
dc.date.conferencedate3-6 June 2019
dc.date.issued2019-06-03
dc.description.abstractAs the adoption of low-voltage-ride-through requirements for low-voltage distribution systems with distributed generators is under consideration, the fulfilment of these requirements should be examined not only as for the proper response of the generating units, but also regarding the selective operation of line protection means (fuses). Within this context, this paper demonstrates the problem of improper (early) fuse operation, with regard to the low-voltage-ride-through requirements, through simulations in a test distribution feeder with photovoltaic generators. A preliminary solution to this problem is examined, based on proper short-circuit current limitation. Two different approaches of this solution are described and compared. Potential techniques for the detailed implementation of the proposed concept are finally discussed.
dc.description.conferencelocationMadrid, Spain
dc.description.conferencenameCIRED 2019
dc.description.openaccessYes
dc.description.peerreviewedYes
dc.description.sessionOperation, control and protection
dc.description.sessionidSession 3
dc.identifier.isbn978-2-9602415-0-1
dc.identifier.issn2032-9644
dc.identifier.urihttps://cired-repository.org/handle/20.500.12455/165
dc.identifier.urihttp://dx.doi.org/10.34890/322
dc.language.isoen
dc.publisherAIM
dc.relation.ispartProc. of the 25th International Conference on Electricity Distribution (CIRED 2019)
dc.relation.ispartofseriesCIRED Conference Proceedings
dc.titleLoss of Neutral in Low Voltage Electrical Installation with connected DG units – Consequences and Solutions
dc.title.number833
dc.typeConference Proceedings
Files
Original bundle
Now showing 1 - 1 of 1
Loading...
Thumbnail Image
Name:
CIRED 2019 - 833.pdf
Size:
571.92 KB
Format:
Adobe Portable Document Format