Loss of Neutral in Low Voltage Electrical Installation with connected DG units – Consequences and Solutions

Loading...
Thumbnail Image

Paper number

833

Working Group Number

Conference name

CIRED 2019

Conference date

3-6 June 2019

Conference location

Madrid, Spain

Peer-reviewed

Yes

Short title

Convener

Authors

Frantzeskakis, Syllas, Democritus University of Thrace, Greece
Voglitsis, Dionisis, Democritus University of Thrace, Greece
Papanikolaou, Nick, Democritus University of Thrace, Greece
Christodoulou, Christos, Democritus University of Thrace, Greece
Gonos, Ioannis, National Technical University of Athens, Greece

Abstract

As the adoption of low-voltage-ride-through requirements for low-voltage distribution systems with distributed generators is under consideration, the fulfilment of these requirements should be examined not only as for the proper response of the generating units, but also regarding the selective operation of line protection means (fuses). Within this context, this paper demonstrates the problem of improper (early) fuse operation, with regard to the low-voltage-ride-through requirements, through simulations in a test distribution feeder with photovoltaic generators. A preliminary solution to this problem is examined, based on proper short-circuit current limitation. Two different approaches of this solution are described and compared. Potential techniques for the detailed implementation of the proposed concept are finally discussed.

Table of content

Keywords

Publisher

AIM

Date

2019-06-03

Permanent link to this record

https://cired-repository.org/handle/20.500.12455/165
http://dx.doi.org/10.34890/322

ISSN

2032-9644

ISBN

978-2-9602415-0-1