Integration of storage and PV in the DSO power losses cost assessment method for LV planning studies

dc.contributor.affiliationUniv. Grenoble Alpes- CNRS- Grenoble INP- G2Elab
dc.contributor.affiliationUniv. Grenoble Alpes CNRS Grenoble INP G2Elab
dc.contributor.affiliationUniv. Grenoble Alpes CNRS Grenoble INP G2Elab
dc.contributor.affiliationUniv. Grenoble Alpes
dc.contributor.authorHadjsaid, Ahmed
dc.contributor.authorAlvarez-Herault, Marie-Cecile
dc.contributor.authorDebusschere, Vincent
dc.contributor.authorCaire, Raphael
dc.contributor.countryFrance
dc.contributor.countryFrance
dc.contributor.countryFrance
dc.contributor.countryFrance
dc.contributor.detailedauthorHadjsaid, Ahmed, Univ. Grenoble Alpes- CNRS- Grenoble INP- G2Elab, France
dc.contributor.detailedauthorAlvarez-Herault, Marie-Cecile, Univ. Grenoble Alpes CNRS Grenoble INP G2Elab, France
dc.contributor.detailedauthorDebusschere, Vincent, Univ. Grenoble Alpes CNRS Grenoble INP G2Elab, France
dc.contributor.detailedauthorCaire, Raphael, Univ. Grenoble Alpes, France
dc.date.accessioned2019-07-24T12:46:27Z
dc.date.available2019-07-24T12:46:27Z
dc.date.conferencedate3-6 June 2019
dc.date.issued2019-06-03
dc.description.abstractThe distribution system operator (DSO) makes investment decisions in the network by computing the capital and operational expenditures (CAPEX and OPEX). The Joule losses, which are integrated into the OPEX, depend on the power flows in the lines at a given time. The method used by the DSO to estimate the cost of the annual Joule losses is empirical and based on an abacus built with two hypotheses: only loads are connected, to a balanced distribution network. These assumptions made sense in balanced medium voltage power systems with little or no local generation. However, at the low voltage level, a strong development ofphotovoltaicgeneration and storage devices is expected, notably affecting the Joule losses. Planners therefore need to ensure that the used model is still valid in these new conditions in order to make the most relevant technical choices. This paper proposes an expression to fit the current DSO abacus and then integrate the storage, the PV production and the unbalance of the network.
dc.description.conferencelocationMadrid, Spain
dc.description.conferencenameCIRED 2019
dc.description.openaccessYes
dc.description.peerreviewedYes
dc.description.sessionPlanning of power distribution systems
dc.description.sessionidSession 5
dc.identifier.isbn978-2-9602415-0-1
dc.identifier.issn2032-9644
dc.identifier.urihttps://cired-repository.org/handle/20.500.12455/655
dc.identifier.urihttp://dx.doi.org/10.34890/877
dc.language.isoen
dc.publisherAIM
dc.relation.ispartProc. of the 25th International Conference on Electricity Distribution (CIRED 2019)
dc.relation.ispartofseriesCIRED Conference Proceedings
dc.titleIntegration of storage and PV in the DSO power losses cost assessment method for LV planning studies
dc.title.number1939
dc.typeConference Proceedings
Files
Original bundle
Now showing 1 - 1 of 1
Loading...
Thumbnail Image
Name:
CIRED 2019 - 1939.pdf
Size:
435.9 KB
Format:
Adobe Portable Document Format