Practical method for global earthing system determination of the urban area

Loading...
Thumbnail Image

Paper number

1497

Working Group Number

Conference name

CIRED 2019

Conference date

3-6 June 2019

Conference location

Madrid, Spain

Peer-reviewed

Yes

Short title

Convener

Authors

Hrobat, Primož, EIMV, Slovenia
Strmec, Jure, EIMV, Slovenia
Bonča, Vilijem, Elektro Gorenjska, Slovenia

Abstract

The paper deals with the ongoing problem with defining and verification of the existence of the global earthing system in an urban area, as outlined in standard SIST EN 50522 [1]. The benefits of such an attempt are to minimize the time and costs associated with basic design parameters of new MV/LV power stations and the effective compliance with legal requirements, considering the necessity to carry out regular earthing system measurement of numerous existing MV/LV power stations, thus ensuring the safety of final consumers.

Table of content

Keywords

Publisher

AIM

Date

2019-06-03

Permanent link to this record

https://cired-repository.org/handle/20.500.12455/423
http://dx.doi.org/10.34890/648