Shaping the Future Croatian Distribution Network with the Ten-Year Network Development Plan

Loading...
Thumbnail Image

Paper number

855

Working Group Number

Conference name

CIRED 2019

Conference date

3-6 June 2019

Conference location

Madrid, Spain

Peer-reviewed

Yes

Short title

Convener

Authors

Hutter, Sandra, Croatian Energy Regulatory Agency (HERA), Croatia
Wagmann, Lahorko, Croatian Energy Regulatory Agency (HERA), Croatia

Abstract

The article “Shaping the Future Croatian Distribution Network with the Ten-Year Network Development Plan” deals with long term planning of Croatian power distribution systems. The Distribution system operator adopts and publishes an annual update to the ten-year distribution network development plan (TYNDP), which provides budgetary and economic analyses for the projected capital investments and establishes a list of priority areas in need of infrastructure upgrades.In the paper it is stressed out that the three main goals of the Ten-Year Network Development Plan (TYNDP) are the improvement in supply quality, an increase in grid capacity and creation of the solid foundations for sustainable growth in the next decade. The long term goal of the Croatian Distribution System Operator as projected in the TYNDP, is to create a distribution network with only one medium voltage network level of 20 kV and one direct transformation of 110/20 kV. The authors pointed out that the implementation of the TYNDP is necessary to preserve the safety and reliability of the energy supply, which requires investments for the renewal of the grid infrastructure.

Table of content

Keywords

Publisher

AIM

Date

2019-06-03

Permanent link to this record

https://cired-repository.org/handle/20.500.12455/172
http://dx.doi.org/10.34890/339

ISSN

2032-9644

ISBN

978-2-9602415-0-1