Smart Grid Ellevio-Demo Stockholm

dc.contributor.affiliationEllevio
dc.contributor.affiliationEllevio
dc.contributor.affiliationEllevio
dc.contributor.affiliationEllevio
dc.contributor.affiliationEllevio
dc.contributor.affiliationEllevio
dc.contributor.affiliationEllevio
dc.contributor.authorLejerskog, Erik
dc.contributor.authorJohansson, Joar
dc.contributor.authorFelix, Isbi
dc.contributor.authorEstéen, Mats
dc.contributor.authorRebner, Stefan
dc.contributor.authorSelberg, Lars
dc.contributor.authorHansson, Olle
dc.contributor.countrySweden
dc.contributor.countrySweden
dc.contributor.countrySweden
dc.contributor.countrySweden
dc.contributor.countrySweden
dc.contributor.countrySweden
dc.contributor.countrySweden
dc.contributor.detailedauthorLejerskog, Erik, Ellevio, Sweden
dc.contributor.detailedauthorJohansson, Joar , Ellevio, Sweden
dc.contributor.detailedauthorFelix, Isbi, Ellevio, Sweden
dc.contributor.detailedauthorEstéen, Mats, Ellevio, Sweden
dc.contributor.detailedauthorRebner, Stefan, Ellevio, Sweden
dc.contributor.detailedauthorSelberg, Lars, Ellevio, Sweden
dc.contributor.detailedauthorHansson, Olle, Ellevio, Sweden
dc.date.accessioned2019-07-24T12:46:46Z
dc.date.available2019-07-24T12:46:46Z
dc.date.conferencedate3-6 June 2019
dc.date.issued2019-06-03
dc.description.abstractThis paper describes Ellevio’s, a Swedish DSO, deliverables within the Horizon 2020 EU financed project; Integrid- demo Stockholm. Ellevio has demo sites located in Stockholm (Ekerö, Kyrkviken and Stockholm Royal Seaport, SRS), including primary and secondary substations, with the main goal to increase the reliability in the grid by using new technology and “time of use tariffs” for residential customers.The main parts under study at the demo sites are fault localization, predictive maintenance, load forecasting and potential for demand response, DR. Preliminary results has shown that fault indicators at Ekerö could make a positive business case after only a few faults and by using information from the protective relays a good estimate of the fault location can be achieved. Moreover, in Stockholm Royal Seaport studies has shown benefits with a higher level of monitoring on the secondary substations to verify that the power quality is within acceptable limit and the ability to analyse outages in retrospect. In Kyrkviken a centralized protection and control system are installed and results on voltage regulation function are presented and tests on predictive maintenance will be carried out.
dc.description.conferencelocationMadrid, Spain
dc.description.conferencenameCIRED 2019
dc.description.openaccessYes
dc.description.peerreviewedYes
dc.description.sessionPlanning of power distribution systems
dc.description.sessionidSession 5
dc.identifier.isbn978-2-9602415-0-1
dc.identifier.issn2032-9644
dc.identifier.urihttps://cired-repository.org/handle/20.500.12455/666
dc.identifier.urihttp://dx.doi.org/10.34890/892
dc.language.isoen
dc.publisherAIM
dc.relation.ispartProc. of the 25th International Conference on Electricity Distribution (CIRED 2019)
dc.relation.ispartofseriesCIRED Conference Proceedings
dc.titleSmart Grid Ellevio-Demo Stockholm
dc.title.number1968
dc.typeConference Proceedings
Files
Original bundle
Now showing 1 - 1 of 1
Loading...
Thumbnail Image
Name:
CIRED 2019 - 1968.pdf
Size:
814.13 KB
Format:
Adobe Portable Document Format