Earthing design incorporating risk quantification – an expensive overhead or key decision-making tool?
Loading...
Paper number
1750
Working Group Number
Conference name
CIRED 2019
Conference date
3-6 June 2019
Conference location
Madrid, Spain
Peer-reviewed
Yes
Short title
Convener
Authors
Carman, William (Bill), Bill Carman Consulting, Australia
Palmer, Stephen , Safearth Consulting, Australia
Palmer, Stephen , Safearth Consulting, Australia
Abstract
The disparity in a range of traditional and contemporary earthing design approaches and the resultant variation in the cost of implementation has been observed by many and has led to a number of studies since the 1960’s, examining the level of risk imposed upon a person by a power system asset in a faulted state. In addition, driven by Work Health & Safety (WH&S) legislation a new safety paradigm is evolving incorporating an explicit requirement to demonstrate due diligence in managing risk imposed upon staff and the public. This paper introduces the findings of the joint Cigre/CIRED working group B3:35 regarding how and why quantified risk analysis (QRA) may be applied to earthing system design.
Table of content
Keywords
Publisher
AIM
Date
2019-06-03
Published in
Permanent link to this record
https://cired-repository.org/handle/20.500.12455/554
http://dx.doi.org/10.34890/777
http://dx.doi.org/10.34890/777
ISSN
2032-9644
ISBN
978-2-9602415-0-1