A Life Cycle Cost study on the impact of the energy transition on the choice of voltage levels in the distribution grid
Loading...
Paper number
1321
Working Group Number
Conference name
CIRED 2019
Conference date
3-6 June 2019
Conference location
Madrid, Spain
Peer-reviewed
Yes
Short title
Convener
Authors
Cuk, Vladimir, Eindhoven University of Technology, Netherlands
Geschiere, Alex, Liander, Netherlands
Piga-Gehrke, Erika, Liander N.V., Netherlands
Geschiere, Alex, Liander, Netherlands
Piga-Gehrke, Erika, Liander N.V., Netherlands
Abstract
This paper describes a methodology and results of a case study comparing the Life Cycle Costs (LCC) of four different operation voltage scenarios of a DSO, where large load increases are to be expected due to the Energy Transition in a period of 40 years. The methodology includes quantifying the conversion costs to another network structure, which makes the comparison much less straight-forward than a greenfield approach. Next to these costs, the investments for capacity extensions, maintenance of network components and costs related to Customer Minutes Lost are quantified. The result is a model for estimating the development costs as a function of load growth.
Table of content
Keywords
Publisher
AIM
Date
2019-06-03
Published in
Permanent link to this record
https://cired-repository.org/handle/20.500.12455/366
http://dx.doi.org/10.34890/592
http://dx.doi.org/10.34890/592
ISSN
2032-9644
ISBN
978-2-9602415-0-1