A Life Cycle Cost study on the impact of the energy transition on the choice of voltage levels in the distribution grid

Loading...
Thumbnail Image

Paper number

1321

Working Group Number

Conference name

CIRED 2019

Conference date

3-6 June 2019

Conference location

Madrid, Spain

Peer-reviewed

Yes

Short title

Convener

Authors

Cuk, Vladimir, Eindhoven University of Technology, Netherlands
Geschiere, Alex, Liander, Netherlands
Piga-Gehrke, Erika, Liander N.V., Netherlands

Abstract

This paper describes a methodology and results of a case study comparing the Life Cycle Costs (LCC) of four different operation voltage scenarios of a DSO, where large load increases are to be expected due to the Energy Transition in a period of 40 years. The methodology includes quantifying the conversion costs to another network structure, which makes the comparison much less straight-forward than a greenfield approach. Next to these costs, the investments for capacity extensions, maintenance of network components and costs related to Customer Minutes Lost are quantified. The result is a model for estimating the development costs as a function of load growth.

Table of content

Keywords

Publisher

AIM

Date

2019-06-03

Permanent link to this record

https://cired-repository.org/handle/20.500.12455/366
http://dx.doi.org/10.34890/592

ISSN

2032-9644

ISBN

978-2-9602415-0-1