Change and change management - unlocking power flexibility meeting Sweden’s capacity challenge
Loading...
Paper number
583
Working Group Number
Conference name
CIRED 2019
Conference date
3-6 June 2019
Conference location
Madrid, Spain
Peer-reviewed
Yes
Short title
Convener
Authors
Ruwaida, Yvonne, Vattenfall Eldistribution AB, Sweden
Backe, John, E:on Energidistribution AB, Sweden
Bjarup, David , E:on Energidistribution AB, Sweden
Backe, John, E:on Energidistribution AB, Sweden
Bjarup, David , E:on Energidistribution AB, Sweden
Abstract
The electricity market in Sweden is changing
to accommodate new trends in energy production and electrification. A potential
hurdle presents itself in the change management. We have much to gain by
realizing the massive challenges this brings, and in understanding the
behavioural change on individuals and in organisations that lies ahead. Through
leveraging previous learning on unlocking flexibility, bilateral treaties and
digital markets, the DSOs can achieve the energy transition and realize a more
efficient and sustainable capacity utilization in the power grids.
Table of content
Keywords
Publisher
AIM
Date
2019-06-03
Published in
Permanent link to this record
https://cired-repository.org/handle/20.500.12455/75
http://dx.doi.org/10.34890/156
http://dx.doi.org/10.34890/156
ISSN
2032-9644
ISBN
978-2-9602415-0-1