SF6 Alternative – What to learn from the high voltage experience

Loading...
Thumbnail Image

Paper number

28

Working Group Number

Conference name

CIRED 2019

Conference date

3-6 June 2019

Conference location

Madrid, Spain

Peer-reviewed

Yes

Short title

Convener

Authors

KIEFFEL, yannick, GE Grid Solutions, France
Ficheux, Arnaud, GE Grid Solutions, France
Luescher, Robert, GE Grid Solutions, Switzerland
Laruelle, Elodie, GE Grid Solutions, France
Maksoud, Louis, GE Grid Solutions, France

Abstract

This paper presents the return of experience gained with g3 products over the past two years through two specific examples. The first example is a 145kV g3 GIS that has been installed in Switzerland. The second example is the 420kV g3 GIL that has been installed in England and in Scotland. Gas handling process, on-site tests and analysis are described through these two examples. On top of that, the full environmental life cycle assessment is presented to highlight the environmental benefit of the new equipment versus the SF6 version.

Table of content

Keywords

Publisher

AIM

Date

2019-06-03

Permanent link to this record

https://cired-repository.org/handle/20.500.12455/670
http://dx.doi.org/10.34890/891

ISSN

2032-9644

ISBN

978-2-9602415-0-1