H2020 sensible Project – Laboratory Results for the Short-Circuit Behaviour of the Storage Devices, under Islanding Conditions

Loading...
Thumbnail Image

Paper number

0248

Working Group Number

Conference name

CIRED 2018 Ljubljana Workshop

Conference date

7 - 8 June 2018

Conference location

Ljubljana, Slovenia

Peer-reviewed

Yes

Short title

Convener

Authors

Lopes Filipe, Nuno, EDP NEW R&D, Portugal
Castanheira Marques, Miguel, EDP NEW R&D, Portugal
André, Ricardo, EDP NEW R&D, Portugal
Rocha, Luís, EDP Labelec, Portugal
Almeida, Bernardo, EDP Distribuição, Portugal
Neves, André, EDP Distribuição, Portugal
Louro, Miguel, EDP Distribuição, Portugal
Damásio, José, Siemens SA, Portugal
Gouveia, Clara, INESC TEC, Portugal

Abstract

The continuous increase of Distributed Generation (DER) along the electrical grid can offer several benefits, such as microgrid operation. However, microgrid operation requires special attention and introduces new challenges to the distribution operators, in particular for the protection systems. In the SENSIBLE project, a H2020 project funded by the European Commission (EU), one of the objectives of the Portuguese demonstrator is to test the islanding operation of a LV secondary substation (SS) with grid and residential storage devices. In the context of this paper, the results of the protection tests performed under laboratory conditions at EDP Labelec are presented. For that purpose, a secondary substation low voltage (LV) grid was built, with the grid embedded storage devices connected to a LV busbar, which provide energy to a set of adjustable loads (three-phase heating fans). The studies were performed for all foreseeable configurations (parallel and island) to ensure clearing of faulted conditions, and with different load scenarios.

Table of content

Keywords

Publisher

AIM

Date

2018-06-07

Permanent link to this record

https://www.cired-repository.org/handle/20.500.12455/1254
http://dx.doi.org/10.34890/422

ISSN

2032-9628

ISBN

978-2-9602415-1-8