Application of dynamic transformer ratings to increase the reserve of primary substations for new load interconnection

dc.contributor.affiliationTomsk Polytechnic University
dc.contributor.affiliationTomsk Polytechnic University
dc.contributor.affiliationTomsk Distribution Company
dc.contributor.affiliationUniv. Grenoble Alpes CNRS Grenoble INP G2Elab
dc.contributor.affiliationUniv. Grenoble Alpes
dc.contributor.authorDaminov, Ildar
dc.contributor.authorProkhorov, Anton
dc.contributor.authorMoiseeva, Tatiana
dc.contributor.authorAlvarez-Herault, Marie-Cecile
dc.contributor.authorCaire, Raphael
dc.contributor.countryRussian Federation
dc.contributor.countryRussian Federation
dc.contributor.countryRussian Federation
dc.contributor.countryFrance
dc.contributor.countryFrance
dc.contributor.detailedauthorDaminov, Ildar, Tomsk Polytechnic University, Russian Federation
dc.contributor.detailedauthorProkhorov, Anton, Tomsk Polytechnic University, Russian Federation
dc.contributor.detailedauthorMoiseeva, Tatiana, Tomsk Distribution Company, Russian Federation
dc.contributor.detailedauthorAlvarez-Herault, Marie-Cecile, Univ. Grenoble Alpes CNRS Grenoble INP G2Elab, France
dc.contributor.detailedauthorCaire, Raphael, Univ. Grenoble Alpes, France
dc.date.accessioned2019-07-24T12:47:57Z
dc.date.available2019-07-24T12:47:57Z
dc.date.conferencedate3-6 June 2019
dc.date.issued2019-06-03
dc.description.abstractThis paper presents new approach to determine power reserve of congested primary substations by taking into account the thermal modelling of power transformers. As novelty, the proposed approach considers the uncertainty of thermal model’s input parameters - annual ambient temperature variation and annual irregularity of new consumer’s load profile. The approach suggested ensures power transformers to continue operation within the acceptable thermal parameters when new consumers are interconnected for this reserve value. The proposed approach is evaluated for real primary substation, located at Tomsk, Russia. The results are compared with conventional approach for reserve determination. GitHub repository link : https://github.com/Ildar-Daminov/Reserve-capacity-of-transformer-for-load-connection
dc.description.conferencelocationMadrid, Spain
dc.description.conferencenameCIRED 2019
dc.description.openaccessYes
dc.description.peerreviewedYes
dc.description.sessionPlanning of power distribution systems
dc.description.sessionidSession 5
dc.identifier.isbn978-2-9602415-0-1
dc.identifier.issn2032-9644
dc.identifier.urihttps://cired-repository.org/handle/20.500.12455/708
dc.identifier.urihttp://dx.doi.org/10.34890/931
dc.language.isoen
dc.publisherAIM
dc.relation.ispartProc. of the 25th International Conference on Electricity Distribution (CIRED 2019)
dc.relation.ispartofseriesCIRED Conference Proceedings
dc.titleApplication of dynamic transformer ratings to increase the reserve of primary substations for new load interconnection
dc.title.number2051
dc.typeConference Proceedings
Files
Original bundle
Now showing 1 - 1 of 1
Loading...
Thumbnail Image
Name:
CIRED 2019 - 2051.pdf
Size:
687.33 KB
Format:
Adobe Portable Document Format