Results of the KALAMEUS Project: A Comprehensive Measurement Campaign for a more efficient Planning and Operation of the Distribution Grid

Loading...
Thumbnail Image

Paper number

1566

Working Group Number

Conference name

CIRED 2019

Conference date

3-6 June 2019

Conference location

Madrid, Spain

Peer-reviewed

Yes

Short title

Convener

Authors

Farhat, Yamshid, BKW Energie AG, Switzerland
Esslinger, Peter, BKW Energie AG, Switzerland
Taxeidis, Efstratios, BKW Energie AG, Switzerland
Reider, Ladislau, BKW Energie AG, Switzerland

Abstract

BKW as the Distribution System Operator (DSO) of the Swiss cantons of Berne and Jura installed more than 800 measurement devices in a representative contiguous area in order to evaluate the existing guidelines and the potential benefit of additional measurement devices at different levels of the distribution network (DN) for planning and operation purposes. The aim of this paper is to present the results of the KALAMEUS project. The analysis of power flow and the simulation of different scenarios enabled the development of new models in order to estimate the maximum load per customer connection and the simultaneity of peak loads. Moreover, the analysis of further simulations with additional distribution generators helped to identify the optimal number of measurement devices for different potential scenarios. This pilot project has identified and analysed about 80 key questions with the collected measurement data of the last two years.

Table of content

Keywords

Publisher

AIM

Date

2019-06-03

Permanent link to this record

https://cired-repository.org/handle/20.500.12455/459
http://dx.doi.org/10.34890/686

ISSN

2032-9644

ISBN

978-2-9602415-0-1