Valuation of harnessing flexibility from decentralized water electrolysis systems for the DSO
Loading...
Paper number
1847
Working Group Number
Conference name
CIRED 2019
Conference date
3-6 June 2019
Conference location
Madrid, Spain
Peer-reviewed
Yes
Short title
Convener
Authors
Sträng, Karl Axel, Enedis, France
Lanoix, Jean-Christophe, Hinicio, France
Neave, Joel, Hinicio, France
Barth, Frederic, Hinicio, France
François, Bruno, Centrale Lille, France
Lanoix, Jean-Christophe, Hinicio, France
Neave, Joel, Hinicio, France
Barth, Frederic, Hinicio, France
François, Bruno, Centrale Lille, France
Abstract
A recent call for projects related to the development of new hydrogen applications and infrastructure in France has revealed renewed interests of city authorities and regions for water electrolysis technologies in order to achieve their energy transition goals. By taking into account the expected business models of these very flexible systems, the cost of providing flexibility services to the distribution system operator was studied for three types of hydrogen infrastructures connected to the electricity distribution grid. The contractual framework was divided into a multi-year commitment contract and a day-ahead activation contract. The calculations of the average costs for the flexibility provision to the DSO reflect these two parts.
Table of content
Keywords
Publisher
AIM
Date
2019-06-03
Published in
Permanent link to this record
https://cired-repository.org/handle/20.500.12455/605
http://dx.doi.org/10.34890/825
http://dx.doi.org/10.34890/825
ISSN
2032-9644
ISBN
978-2-9602415-0-1