Impact of Voltage and Network Losses on Conductor Sizing and Topology of MV Networks with High Penetration of Renewable Energy Resources

dc.contributor.affiliationAalto University
dc.contributor.affiliationTrimble Solutions
dc.contributor.affiliationMitteldeutsche Netzgesellschaft Strom mbH
dc.contributor.affiliationLEW Verteilnetz GmbH
dc.contributor.affiliationMitteldeutsche Netzgesellschaft Strom mbH
dc.contributor.authorMillar, John
dc.contributor.authorSaarijärvi, Eero
dc.contributor.authorMüller, Udo
dc.contributor.authorFettke, Stephan
dc.contributor.authorFiller, Marko
dc.contributor.countryFinland
dc.contributor.countryFinland
dc.contributor.countryGermany
dc.contributor.countryGermany
dc.contributor.countryGermany
dc.contributor.detailedauthorMillar, John, Aalto University, Finland
dc.contributor.detailedauthorSaarijärvi, Eero, Trimble Solutions, Finland
dc.contributor.detailedauthorMüller, Udo, Mitteldeutsche Netzgesellschaft Strom mbH, Germany
dc.contributor.detailedauthorFettke, Stephan, LEW Verteilnetz GmbH, Germany
dc.contributor.detailedauthorFiller, Marko, Mitteldeutsche Netzgesellschaft Strom mbH, Germany
dc.date.accessioned2019-07-24T12:38:09Z
dc.date.available2019-07-24T12:38:09Z
dc.date.conferencedate3-6 June 2019
dc.date.issued2019-06-03
dc.description.abstractThis paper discusses heuristic distribution company planning rules, which are pragmatic but challenging to implement in a planning algorithm that aims to efficiently produce close to optimum solutions. The main focus is on how voltage is handled, and how other parameters, such as the cost of network losses and the time horizon used for planning, affect voltage. This is illustrated via Greenfield horizon plans and cost breakdowns based on a typical distribution network in the south of Germany.
dc.description.conferencelocationMadrid, Spain
dc.description.conferencenameCIRED 2019
dc.description.openaccessYes
dc.description.peerreviewedYes
dc.description.sessionPlanning of power distribution systems
dc.description.sessionidSession 5
dc.identifier.isbn978-2-9602415-0-1
dc.identifier.issn2032-9644
dc.identifier.urihttps://cired-repository.org/handle/20.500.12455/214
dc.identifier.urihttp://dx.doi.org/10.34890/415
dc.language.isoen
dc.publisherAIM
dc.relation.ispartProc. of the 25th International Conference on Electricity Distribution (CIRED 2019)
dc.relation.ispartofseriesCIRED Conference Proceedings
dc.titleImpact of Voltage and Network Losses on Conductor Sizing and Topology of MV Networks with High Penetration of Renewable Energy Resources
dc.title.number949
dc.typeConference Proceedings
Files
Original bundle
Now showing 1 - 1 of 1
Loading...
Thumbnail Image
Name:
CIRED 2019 - 949.pdf
Size:
888.96 KB
Format:
Adobe Portable Document Format