Impact of Voltage and Network Losses on Conductor Sizing and Topology of MV Networks with High Penetration of Renewable Energy Resources

Loading...
Thumbnail Image

Paper number

949

Working Group Number

Conference name

CIRED 2019

Conference date

3-6 June 2019

Conference location

Madrid, Spain

Peer-reviewed

Yes

Short title

Convener

Authors

Millar, John, Aalto University, Finland
Saarijärvi, Eero, Trimble Solutions, Finland
Müller, Udo, Mitteldeutsche Netzgesellschaft Strom mbH, Germany
Fettke, Stephan, LEW Verteilnetz GmbH, Germany
Filler, Marko, Mitteldeutsche Netzgesellschaft Strom mbH, Germany

Abstract

This paper discusses heuristic distribution company planning rules, which are pragmatic but challenging to implement in a planning algorithm that aims to efficiently produce close to optimum solutions. The main focus is on how voltage is handled, and how other parameters, such as the cost of network losses and the time horizon used for planning, affect voltage. This is illustrated via Greenfield horizon plans and cost breakdowns based on a typical distribution network in the south of Germany.

Table of content

Keywords

Publisher

AIM

Date

2019-06-03

Permanent link to this record

https://cired-repository.org/handle/20.500.12455/214
http://dx.doi.org/10.34890/415

ISSN

2032-9644

ISBN

978-2-9602415-0-1