Case study of the implementation of cross-bonding to underground long medium voltage cables in wind parks
Paper number
2091Conference name
CIRED 2019Conference date
3-6 June 2019Conference location
Madrid, SpainPeer-reviewed
YesMetadata
Show full item recordAuthors
Kalogrianitis, Elefterios, National Technical University of Athens, GreeceDamianaki, Katerina, National Technical University of Athens, Greece
Christodoulou, Christos, National Technical University of Athens, Greece
Papadopoulos, Theofilos, Democritus University of Thrace, Greece
Gonos, Ioannis, National Technical University of Athens, Greece
Abstract
Cross-bonding, i.e. the special bonding in which the metallic sheaths of different phase power cables in successive minor sections are cross-connected in such a way so as to attain partial or full cancellation of induced currents on the metallic sheaths, is implemented in an effort to reduce the energy losses and improve the sheath voltage distribution. This paper deals with the implementation of cross-bonding to underground long medium voltage single conductor cables, which are widely used in the interconnection of wind parks to the power grid over the last years.Publisher