dc.description.abstractThe Powerful CB project is a collaboration between UK Power Networks (UKPN) and ABB to develop and demonstrate, in a pilot, an 11 kV Fault Current Limiting Circuit Breaker, FLCB, in an existing UK Power Networks substation. The FLCB pilot is designed for 12 kV, 2000 A nominal current and will be tested with a prospective fault current of 25 kA. In operation it limits the prospective fault current to maximum 13 kA peak in less than 1 ms after the trip signal.It has been identified that a Fault Current Limiting Circuit Breaker is an attractive alternative compared to upgrading distribution substations when short circuit headroom is shrinking. A hybrid, mechanical and power electronics, fault current limiter concept is presented, which will be built, tested and installed in a London substation during 2019. The fast, compact, low loss and multi-shot FLCB makes it possible to run the distribution system at a higher fault level giving better system stability without the need of a complete upgrade of the substation. At the same time the technology enables more flexible and optimized connection of distributed generation and renewable energy sources, independent of existing fault level headroom.
dc.language.isoen
dc.publisherAIM
dc.relation.ispartofseriesCIRED Conference Proceedings
dc.titleFault current limiting circuit breaker in distribution systems
dc.typeConference Proceedings
dc.description.conferencelocationMadrid, Spain
dc.relation.ispartProc. of the 25th International Conference on Electricity Distribution (CIRED 2019)
dc.contributor.detailedauthorBackman, Magnus, ABB Corporate Research, Sweden
dc.contributor.detailedauthorEriksson, Thomas, ABB Corporate Research, Sweden
dc.contributor.detailedauthorHintzen, Tobias, ABB AG, Germany
dc.contributor.detailedauthorMoutafidis, John, UK Power Networks, United Kingdom
dc.date.conferencedate3-6 June 2019
dc.description.peerreviewedYes
dc.title.number2050
dc.description.openaccessYes
dc.contributor.countrySweden
dc.contributor.countrySweden
dc.contributor.countryGermany
dc.contributor.countryUnited Kingdom
dc.description.conferencenameCIRED 2019
dc.contributor.affiliationABB Corporate Research
dc.contributor.affiliationABB Corporate Research
dc.contributor.affiliationABB AG
dc.contributor.affiliationUK Power Networks
dc.description.sessionNetwork components
dc.description.sessionidSession 1


Files in this item

Thumbnail

This item appears in the following Collection(s)

Show simple item record