CIM-based systems integration project at Elektro Celje DSO

Loading...
Thumbnail Image
Paper number
1883
Working Group Number
Conference name
CIRED 2019
Conference date
3-6 June 2019
Conference location
Madrid, Spain
Peer-reviewed
Yes
Short title
Convener
Authors
Souvent, Andrej, Elektroinstitut Milan Vidmar - EIMV, Slovenia
Kodek, Timotej , Elektroinstitut Milan Vidmar - EIMV, Slovenia
Kavčič, Mateja, GDI d.o.o., Slovenia
Petrovič, Viki, GDI d.o.o., Slovenia
Rauter, Dušan, Bintegra d.o.o., Slovenia
Risteski, Nikola , Bintegra d.o.o., Slovenia
Benassi, Rene , Iskratel d.d., Slovenia
Lubej, Peter, Elektro Celje d.d., Slovenia
Abstract
This paper gives an insight into the CIM based integration pilot project at the DSO Elektro Celje. This project was done as part of the bilateral cooperation project between the Slovenian TSO – ELES covering a consortium of partners and the Japanese agency NEDO with its’ authorized contractor Hitachi, Ltd. The main goal of the project was to utilize IT integration standards based on the IEC CIM (Common Information Model – family of standards IEC61970, IEC61968 and IEC62325). The main aim was to integrate DSO’s existing OT/IT systems (Geographic Information System – GIS and Metering Data Management System – MDMS) and newly introduced Distribution Management System (DMS). Within the project we have implemented multiple use cases in order to demonstrate the effectiveness of such an approach. In this paper we state what the goals were, as well as some implementation details about the project and eventually discuss the lessons that were learned during the project.
Table of content
Keywords
Publisher
AIM
Date
2019-06-03
Permanent link to this record
https://cired-repository.org/handle/20.500.12455/627
http://dx.doi.org/10.34890/854
ISSN
2032-9644
ISBN
978-2-9602415-0-1