Case study for understanding impact of residential batteries on LV grids

Loading...
Thumbnail Image
Paper number
1577
Working Group Number
Conference name
CIRED 2019
Conference date
3-6 June 2019
Conference location
Madrid, Spain
Peer-reviewed
Yes
Short title
Convener
Authors
Chittur Ramaswamy, Parvathy, Tractebel, Belgium
Schyns, Damien, Tractebel, Belgium
De Vos, Louise, Tractebel Engie, Belgium
Czajkowski, Christian , InnogySE, Germany
Wilch, Michael, Innogy SE, Germany
Gaul, Armin , InnogySE, Germany
Abstract
 Local clusters of DERs, e.g. photovoltaic residential rooftop installations, stress the distribution grid due to reverse flows and induced overvoltage. In case of overvoltage, PV installations are curtailed. To avoid or decrease this loss of production, Innogy, a holding of German distribution system operators, is exploring mitigation strategies. In this context, this paper presents the impact of residential batteries and their charging strategies on the LV network simulated using the Smart Operation tool. Additionally, this paper presents the impact of forecasting errors on the battery control strategies. 
Table of content
Keywords
Publisher
AIM
Date
2019-06-03
Permanent link to this record
https://cired-repository.org/handle/20.500.12455/467
http://dx.doi.org/10.34890/693
ISSN
2032-9644
ISBN
978-2-9602415-0-1