Impact of Voltage and Network Losses on Conductor Sizing and Topology of MV Networks with High Penetration of Renewable Energy Resources
Paper number
949Conference name
CIRED 2019Conference date
3-6 June 2019Conference location
Madrid, SpainPeer-reviewed
YesMetadata
Show full item recordAuthors
Millar, John, Aalto University, FinlandSaarijärvi, Eero, Trimble Solutions, Finland
Müller, Udo, Mitteldeutsche Netzgesellschaft Strom mbH, Germany
Fettke, Stephan, LEW Verteilnetz GmbH, Germany
Filler, Marko, Mitteldeutsche Netzgesellschaft Strom mbH, Germany
Abstract
This paper discusses heuristic distribution company planning rules, which are pragmatic but challenging to implement in a planning algorithm that aims to efficiently produce close to optimum solutions. The main focus is on how voltage is handled, and how other parameters, such as the cost of network losses and the time horizon used for planning, affect voltage. This is illustrated via Greenfield horizon plans and cost breakdowns based on a typical distribution network in the south of Germany.Publisher
AIMDate
2019-06-03Published in
Permanent link to this record
https://cired-repository.org/handle/20.500.12455/214http://dx.doi.org/10.34890/415