R&I needs and challenges for a future reliable, economic and efficient smart grid system taking into account micro-grids and local energy communities to support the EU Energy transition

Loading...
Thumbnail Image
Paper number
0100
Working Group Number
Conference name
CIRED 2018 Ljubljana Workshop
Conference date
7 - 8 June 2018
Conference location
Ljubljana, Slovenia
Peer-reviewed
Yes
Short title
Convener
Authors
Rinaldi, Raphael, Enel Global Infrastructures & Networks , Italy
Losa, Ilaria, RSE - Ricerca sul Sistema Energetico, Italy
Carrilero-Borbujo, Isabel, SODENA, Spain
Prata, Ricardo, EDP – Distribuição Energia , Portugal
MÜNSTER, Marie, DTU, Denmark
Kulmala, Anna, VTT Technical Research Centre of Finland Ltd, Finland
Samovich, Natalie, Enercoutim , Portugal
Střelec, Martin, University of West Bohemia, The Czech Republic
Bermúdez Llamusí, Víctor, Red Eléctrica de España, Spain
ALVES, Rui, R&D Nester, Portugal
Friedl, Werner, AIT Austrian Institute of Technology, Austria
Abstract
In its Research and Innovation Roadmap, targeting a 10year period from 2017 to 2026, the European Technology and Innovation Platform for Smart Networks for the Energy Transition (ETIP SNET) defines long-term priorities for investment in Research and Innovation (R&I) activities within the European energy sector. Priorities are established having in mind the EU energy strategy and the expected future challenges of different stakeholders in the energy value chain. Complementarily, the ETIP SNET prioritizes the R&I activities with an Implementation Plan (IP), based on the R&I Roadmap, for the short-term, in which a 3-year period, from 2017 to 2020, is considered. This paper will focus on the microgrid and local energy communities’ aspects that are tackled in the ETIP-SNET Roadmap and Implementation Plan.
Table of content
Keywords
Publisher
AIM
Date
2018-06-07
Permanent link to this record
https://www.cired-repository.org/handle/20.500.12455/1194
http://dx.doi.org/10.34890/298
ISSN
2032-9628
ISBN
978-2-9602415-1-8